Switch Data Center: NAP 1

Switch Data Center - Mission Critical

Switch NAP 1 totaled over 200,000 SF and was the first building completed for the large data center campus. Scope work for this project included foundations, elevator pits, 175,000 SF slab on grade, 30,000 SF slab on metal deck and tilt up construction for all walls. The tilt scope of work for Switch NAP 1 included 190 panels that totaled 144,821 SF of wall surface area for the building.

Size:

200,000 SF

Location:

Austell, GA

General Contractor:

Martin Harris Construction